Our Custom Cabinet Process: From Vision to Reality

Most custom cabinet projects in Calgary take 6 to 12 weeks from initial consultation to completed installation—with kitchens averaging 6-9 weeks, bathroom vanities 4-6 weeks, and built-ins 6-10 weeks. At Planar Millwork, we’ve refined this process over 200+ projects to ensure predictable timelines, transparent pricing, and exceptional results.

We understand that investing in custom cabinetry is a significant decision. That’s why transparency guides everything we do. Before you commit, you’ll know exactly what to expect: detailed timelines, itemized pricing ($250-$650 per linear foot for kitchens), and open communication at every stage.

Steps - The Process

01    Initial consultation

01

Initial consultation

Timeline: 1-2 hours | Cost: FREE, no-obligation

Your custom cabinet journey begins with a free consultation—either at your home or in our Calgary showroom. This initial meeting is where we understand your vision and assess your space.

During your consultation, we'll discuss:
  • Your design vision and style preferences (58% choose shaker, 22% modern flat-panel)
  • Functional needs—how you use your space daily
  • Budget parameters ($18K-$24K typical kitchen, $3K-$8K typical bathroom)
  • Timeline expectations and project scheduling

We’ll take preliminary measurements, review our portfolio of 200+ completed Calgary projects, and answer every question.

01

02

Design & planning

02

Timeline: 1-2 weeks | Deliverable: 3D renderings + itemized quote

This is where your custom cabinets begin taking shape. Our designers capture precise measurements—to 1/16 inch accuracy—ensuring every cabinet fits perfectly.

Your custom design development includes:
  • Detailed floor plans and elevations
  • Photorealistic 3D renderings showing your exact space
  • Multiple layout options when applicable
  • Material recommendations (62% of clients choose maple)
  • Itemized pricing with no hidden costs

We typically include 2-3 revision rounds to refine the design until it’s exactly right.

03

Material selection

03

Timeline: 1-2 visits over 1-2 weeks

Seeing materials on a screen is different from touching them in person. We invite you to our showroom to experience your options firsthand.

Your material selection visit includes:
  • Viewing actual wood species (maple 62%, oak 18%, walnut 12%, cherry 8%)
  • Feeling finish textures—matte, satin, high-gloss
  • Testing Blum soft-close hardware rated for 100,000+ cycles
  • Selecting exact paint colors or stain shades
  • Coordinating with countertop selections if applicable

04

Fabrication

04

Timeline: 4-6 weeks (kitchens) | 3-5 weeks (vanities/built-ins) | Updates provided

This is where the magic happens—in our Calgary workshop, not overseas. Your cabinets are built by local craftspeople using 3/4″ plywood construction and Blum hardware.

Our fabrication process combines:
  • CNC precision cutting for perfect consistency (1/16 inch accuracy)
  • Hand-crafted details that machines can’t replicate
  • Quality control inspections at every stage
  • Custom finishing in controlled spray environment
  • Hardware pre-installation for efficiency

Quality craftsmanship takes time—we won’t rush your cabinets. We provide progress updates and photos.

05

Professional installation

05

Timeline: 1-2 days (vanities) | 3-5 days (kitchens) | 1-3 days (built-ins)

Installation day is exciting—you finally see your custom cabinets in place. Our professional installation team (not subcontractors) handles every detail.

What to expect during installation:
  • Scheduled arrival time—we respect your schedule
  • Protection of your floors, walls, and belongings
  • Precise leveling and secure wall mounting
  • Fine-tuning of doors and drawers for perfect alignment
  • Coordination with plumbers or electricians if needed
  • Daily cleanup—we leave your home tidy

06

Final walkthrough & ongoing support

06

Timeline: 30-60 minutes + ongoing availability

Before we call your project complete, we conduct a detailed walkthrough together. We inspect every cabinet, drawer, and piece of hardware.

Your final walkthrough includes:
  • Demonstration of all features and hardware
  • Care and maintenance instructions (for 20+ year lifespan)
  • Warranty documentation and coverage details
  • Any final adjustments made on the spot
  • Direct contact information for future needs

Total project timeline

Typical Custom Cabinet Project: 6-12 Weeks

Based on our 200+ completed projects, here’s how timelines typically break down:

Kitchen Cabinets

6-9 weeks total

(4-6 weeks fabrication, 3-5 days install)

Bathroom Vanities

4-6 weeks total

(3-5 weeks fabrication, 1-2 days install)

Living Space Built-Ins

6-10 weeks total

(5-8 weeks fabrication, 1-3 days install)

Storage Solutions

4-8 weeks total

(3-6 weeks fabrication, 1-2 days install)

Commercial Projects

4-16 weeks total

(3-10 weeks fabrication, 1-5 days install)

What makes our process different

Typical Custom Cabinet Project: 6-12 Weeks

Based on our 200+ completed projects, here’s how timelines typically break down:

Single Point of Contact

One dedicated project manager from consultation through installation.

In-House Everything

Design, fabrication, finishing, installation all under our roof. No subcontractors.

Transparent Pricing

Kitchens at $250-$650/linear foot, vanities $3K-$8K. No surprise costs.

Quality Over Speed

3/4″ plywood, Blum hardware, built to last 20+ years.

Local Advantage

200+ Calgary installations. Your neighbors.

Climate Knowledge

Materials that perform in Alberta’s 30-40% winter humidity.

Your role in the process

A smooth cabinet project is a partnership. Here’s how you can help ensure success:

  • Share inspiration images or Pinterest boards during consultation
  • Make decisions within agreed timeframes to maintain schedule
  • Be available for key milestones: design approval, material selection, walkthrough
  • Clear the installation area before our team arrives
  • Communicate openly—questions are always welcome

Frequently Asked Questions

Most custom cabinet projects take 6 to 12 weeks from consultation to completed installation. Kitchen projects typically require 6-9 weeks, bathroom vanities 4-6 weeks, and built-in cabinetry 6-10 weeks. We provide a specific timeline based on your project scope during your free consultation.

Yes—we welcome clients to visit our Calgary workshop during fabrication to see their cabinets taking shape. We also provide progress photos throughout the build process.

We understand ideas evolve. Minor adjustments can often be accommodated. Significant changes may affect timeline and cost—we discuss options transparently.

During design and fabrication (6-8 weeks)—absolutely, your kitchen functions normally. During installation (3-5 days), kitchen access is limited. We help you plan for temporary arrangements.

Our precise measurement process (1/16 inch accuracy) virtually eliminates fit issues. In the rare event something isn’t perfect, we address it immediately at no additional cost.

We use a milestone-based payment schedule: deposit at contract signing (typically 40%), progress payment before fabrication begins (40%), and final payment upon your approval at walkthrough (20%).

Planar Millwork provides a comprehensive warranty covering materials and workmanship. Our cabinets are built to last 20+ years with proper care.

We coordinate with licensed Calgary plumbers and electricians as needed. They work alongside our installation team for seamless integration.

Ready to Start Your Custom Cabinet Project?

The first step is simple: a free consultation where we explore your vision, answer your questions, and provide a detailed timeline. Most consultations take 1-2 hours.

After you reach out:

  1. We respond within 1 business day
  2. Schedule a consultation at your convenience
  3. Receive 3D designs and itemized quote within 1-2 weeks
  4. Begin building your dream cabinets